Consumable Materials Procurement for Units 5 and 6 at PT PLN Nusantara Power UP Cirata
Procurement of consumable materials for Units 5 and 6 at PT PLN Nusantara Power UP Cirata to support the operational and maintenance …

Procurement of consumable materials for Units 5 and 6 at PT PLN Nusantara Power UP Cirata to support the operational and maintenance …
Replacement of the Motor Operated Valves (MOVs) serving the essential systems of the Heat Recovery Steam Generator (HRSG) and Steam Turbine …
Repair services for the mill gearbox at PT PLN Nusantara Power UP Rembang to support the reliability and performance of the power plant's …
Procurement of consumable materials to support the 2025 overhaul activities for Units 3 and 4 at PT PLN Nusantara Power UP Cirata. The …
Procurement of a gearbox and electric motor for the Drum Screen system at PT PLN Nusantara Power UP Muara Karang. The procurement aims to …
Procurement of an electric motor for the Close Cooling Water Pump at PT PLN Nusantara Power UP Paiton. The project aims to support the …
Procurement of a battery charger and battery storage system for the Emergency Diesel Generator (EDG) Phase 1 at Block 1 of the Combined …
Replacement of the inner parts of the Control Valve in the Heat Recovery Steam Generator (HRSG) system at Block 2 of PT PLN Nusantara Power …
Procurement of one battery bank and charger system for Unit 2, Phase 2 at PT PLN Nusantara Power UP Kaltim Teluk. The project aims to …
Procurement of a gearbox and electric motor for the Drum Screen system at PT PLN Nusantara Power UP Muara Karang. The procurement aims to …
Procurement of a battery storage and battery charger system for Gas Turbine Generator (GTG) 1.1 at PT PLN Nusantara Power UP Muara Karang. …
Procurement of an igniter transformer for the Gas Turbine system at PT PLN Nusantara Power UP Muara Karang. The procurement aims to support …
Replacement of the Slum Shut Valve in the Gas Turbine System (GTS) at Block 2 of the Combined Cycle Gas Turbine (CCGT) Power Plant, PT PLN …
Procurement of a gearbox for the mill system at PT PLN Nusantara Power UP Paiton. The procurement aims to support the operational …
Procurement of a 40 kVA inverter for PT Thredio Engineering to support electrical power conversion and supply requirements. The equipment …
The retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton is intended to modernize and improve the reliability …
The procurement of a 300 HP Alternating Current (AC) electric motor for a fire pump for PT Airindo Teknologi Perkasa is intended to support …
The procurement of a video wall for the Digital Power Plant (DPP) Room at the HSH Unit of PT PLN Nusantara Power Head Office is intended to …
The procurement of a condensate pump for Unit 1 at Bangka Steam Power Plant (PLTU Bangka) is intended to support the condensate system …
The procurement of EWS Hydran sensors for main transformers ST 2.0, ST 3.0, and GTG 3.3 at PT PLN Nusantara Power UP Gresik is intended to …
The procurement of an additional jockey pump and diesel fire pump at PT PLN Nusantara Power UP Cirata is intended to enhance the capacity …
The procurement of Motor Operated Valve (MOV) materials for the ID Fan and Turbine areas of Unit 20 at PT PLN Nusantara Power UP Rembang is …
The procurement of actuator inner parts for PT PLN Nusantara Power UP Muara Karang is intended to support actuator maintenance and restore …
The procurement of consumable materials under a framework contract at PT PLN Nusantara Power UP Cirata is intended to ensure the …
The procurement of the 220 VDC Battery Storage System #1 at PT PLN Nusantara Power UP Paiton is intended to provide reliable backup DC power …
The procurement of a battery storage and battery charger system for PT PLN Nusantara Power UP Muara Karang is intended to support the …
The procurement of WIKA thermocouples at PT PLN Nusantara Power UP Muara Tawar is intended to support temperature measurement and monitoring …
The procurement of the 220 VDC Battery Storage System #2 at PT PLN Nusantara Power UP Paiton is intended to provide a reliable backup DC …
The procurement of storage batteries for STG #1.0 and the Lobby, Phase 1 at PT PLN Nusantara Power UP Muara Karang is intended to support …
The procurement of a motor and blower for the GTG frame casing at Block 1 CCGT Plant, PT PLN Nusantara Power UP Muara Karang, is intended to …
The procurement of a screen wash pump motor at PT PLN Nusantara Power UP Muara Karang is intended to support the operation of the screen …

Implementation of an integrated videowall system for Bank BRI Control Center to support centralized monitoring, information visualization, …

Procurement and normalization of the CCTV system at PJB-UP Muara Tawar to restore and enhance the reliability, availability, and performance …