Case Study

Hang Nadim Airport - FIDS, System Maintenance & Migration From Existing System

Hang Nadim Airport - FIDS, System Maintenance & Migration From Existing System

Solution

Airport Solutions

Category

Projects

Date

2012

Share

This is our first project that giving us motivation to enter the airport solution business. We do migration from existim system to Inalix FIDS.

Thankfully this project is successfully executed and it make us confident to enter the airport solution business.

Case Details

  • Client Name: Badan Otorita Batam - Hang Nadim Batam Airport
  • Airport Location: Hang Nadim Airport - Batam
  • Started: September 2001
  • Completed: December 2001
  • Category: FIDS , Migration, System Maintenance

More Portfolios

OTHER PROJECTS

CCTV System Procurement & Normalization at PJB-UP Muara Tawar
Industrial Solutions ▪ Projects

CCTV System Procurement & Normalization at PJB-UP Muara Tawar

Procurement and normalization of the CCTV system at PJB-UP Muara Tawar to restore and enhance the reliability, availability, and performance of the existing surveillance infrastructure. The project covers the provision of CCTV equipment, system restoration, and optimization to support effective monitoring and security across designated operational areas.

FIDS Implementation for SOC Airport Extension at Adi Soemarmo International Airport
Airport Solutions ▪ Projects

FIDS Implementation for SOC Airport Extension at Adi Soemarmo International Airport

Implementation of the Flight Information Display System (FIDS) as part of the SOC Airport extension project at Adi Soemarmo International Airport to support reliable and real-time flight information delivery across the expanded terminal areas. The solution extends the airport’s passenger information infrastructure, ensuring accurate and consistent flight information is accessible throughout the newly developed areas.