Case Study

Airport Systems Implementation for Domestic Terminal Renovation at I Gusti Ngurah Rai International Airport

Airport Systems Implementation for Domestic Terminal Renovation at I Gusti Ngurah Rai International Airport

Client

PT Angkasa Pura I

Location

Bali, Indonesia

Date

2014 - 2014

Share

Integrated Airport Systems for Terminal Modernization

As part of the Domestic Terminal Renovation at I Gusti Ngurah Rai International Airport, INALIX implemented a comprehensive suite of airport systems designed to support integrated terminal operations and passenger information services.

The project scope included INALIX-developed Flight Information Display System (FIDS), Airport Announcement System (AAS), Airport Operational Database (AODB), SIOPSKOM, and Billing System, along with the integration of Master Clock and Digital Signage.

Through the integration of these systems, operational data can be centrally managed and distributed to support real-time flight information, passenger announcements, time synchronization, digital content distribution, and other essential terminal operations.

This implementation demonstrates INALIX’s capability to develop and integrate airport technology solutions, creating a more connected, reliable, and efficient operational environment.

More Portfolios

OTHER PROJECTS

Retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton

The retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton is intended to modernize and improve the reliability of the DC battery charging system. This system plays a critical role in supplying DC power to various control, protection, and auxiliary systems within the power plant. Through this retrofit work, the Battery Charger systems are expected to maintain reliable operation and support the continuity of DC power supply in accordance with the plant's operational requirements.

Procurement of Battery Charger and Battery Storage System for EDG Phase 1, Block 1 CCGT Plant at PT PLN Nusantara Power UP Muara Karang

Procurement of a battery charger and battery storage system for the Emergency Diesel Generator (EDG) Phase 1 at Block 1 of the Combined Cycle Gas Turbine (CCGT) Power Plant at PT PLN Nusantara Power UP Muara Karang. The project supports the reliability of the EDG electrical system by ensuring the availability of a dependable DC power supply for emergency generator starting and essential auxiliary functions.