Case Study

Barix & ATV Installation, FIDS Maintenance, and AAS Clustering at Hang Nadim International Airport

Barix & ATV Installation, FIDS Maintenance, and AAS Clustering at Hang Nadim International Airport

Client

PT Angkasa Pura I

Location

**Integrated Airport Information & Communication System Enhancement** INALIX delivered the installation of Barix and ATV equipment, FIDS maintenance, and AAS clustering at Hang Nadim International Airport as part of an integrated enhancement of the airport’s information and communication infrastructure. FIDS maintenance was carried out to maintain system reliability and ensure continuous delivery of flight information, while AAS clustering was implemented to optimize the distribution and management of airport announcements. The installation of Barix and ATV equipment further supports the airport’s communication and information infrastructure, contributing to a more reliable and integrated operational environment. Together, these works enhance system availability, passenger information delivery, and the continuity of day-to-day airport operations.

Date

2021 - 2021

Share

Integrated Airport Information & Communication System Enhancement

INALIX delivered the installation of Barix and ATV equipment, FIDS maintenance, and AAS clustering at Hang Nadim International Airport as part of an integrated enhancement of the airport’s information and communication infrastructure.

FIDS maintenance was carried out to maintain system reliability and ensure continuous delivery of flight information, while AAS clustering was implemented to optimize the distribution and management of airport announcements.

The installation of Barix and ATV equipment further supports the airport’s communication and information infrastructure, contributing to a more reliable and integrated operational environment.

Together, these works enhance system availability, passenger information delivery, and the continuity of day-to-day airport operations.

More Portfolios

OTHER PROJECTS

Essential MOV Replacement for HRSG and Steam Turbine Block 2 at PT PLN Nusantara Power UP Muara Karang

Replacement of the Motor Operated Valves (MOVs) serving the essential systems of the Heat Recovery Steam Generator (HRSG) and Steam Turbine (ST) at Block 2 of PT PLN Nusantara Power UP Muara Karang. This project was carried out to support equipment reliability, maintain operational performance, and ensure the availability of critical valve systems within the power generation facility.