Case Study

CCTV System Procurement & Normalization at PJB-UP Muara Tawar

CCTV System Procurement & Normalization at PJB-UP Muara Tawar

Category

Industrial

Client

PJB

Location

Bekasi, Indonesia

Date

2015 - 2015

Share

Enhancing Surveillance System Reliability

INALIX delivered the procurement and normalization of the CCTV system at PJB-UP Muara Tawar to improve the reliability and performance of the existing surveillance infrastructure.

The project involved the provision of required CCTV equipment, restoration of existing system functionality, and optimization of the surveillance infrastructure to ensure effective and continuous monitoring across designated areas.

Through system normalization and infrastructure enhancement, the implementation provides a more reliable surveillance platform to support security, monitoring, and day-to-day operational activities.

More Portfolios

OTHER PROJECTS

Essential MOV Replacement for HRSG and Steam Turbine Block 2 at PT PLN Nusantara Power UP Muara Karang

Replacement of the Motor Operated Valves (MOVs) serving the essential systems of the Heat Recovery Steam Generator (HRSG) and Steam Turbine (ST) at Block 2 of PT PLN Nusantara Power UP Muara Karang. This project was carried out to support equipment reliability, maintain operational performance, and ensure the availability of critical valve systems within the power generation facility.

Procurement of 300 HP AC Electric Motor for Fire Pump, PT Airindo Teknologi Perkasa

The procurement of a 300 HP Alternating Current (AC) electric motor for a fire pump for PT Airindo Teknologi Perkasa is intended to support the operation of the fire protection system. The motor serves as the primary drive for the fire pump, providing the mechanical power required to deliver water at the pressure and flow rate needed for firefighting applications. This equipment is expected to support reliable fire pump operation and ensure the readiness of the fire protection system when required.