Case Study

Consumable Materials Procurement for Units 5 and 6 at PT PLN Nusantara Power UP Cirata

Category

Industrial

Client

PT PLN Nusantara Power

Location

Purwakarta, Indonesia

Date

2026 - 2026

Share

Material Procurement Support for Power Plant Operational Reliability

INALIX carried out the procurement of consumable materials for Units 5 and 6 at PT PLN Nusantara Power UP Cirata.

This procurement project addressed the material requirements supporting the operation and maintenance of the power generation units. The availability of consumable materials that meet technical specifications and operational requirements plays an important role in maintaining equipment readiness and supporting maintenance activities.

Through the supply of required materials, INALIX contributes to maintaining equipment availability and ensuring the continuity of power plant operations.

More Portfolios

OTHER PROJECTS

AI Murni Slum Shut Valve Replacement for GTS at Block 2 CCGT Plant, PT PLN Nusantara Power UP Muara Karang

Replacement of the Slum Shut Valve in the Gas Turbine System (GTS) at Block 2 of the Combined Cycle Gas Turbine (CCGT) Power Plant, PT PLN Nusantara Power UP Muara Karang. The project involved the replacement of critical valve equipment to support the reliability of the gas turbine fuel system, maintain operational performance, and ensure the proper functioning of the associated gas supply system.

FIDS & Airport Announcement System (AAS) Implementation at Yogyakarta International Airport

FIDS & Airport Announcement System (AAS) Implementation at Yogyakarta International Airport

Implementation of the Flight Information Display System (FIDS) and Airport Announcement System (AAS) at Yogyakarta International Airport to support integrated passenger information and communication services across the terminal. The solution combines real-time flight information displays with a centralized announcement system, enabling accurate, timely, and consistent communication throughout the airport.