Case Study

Control Valve Inner Parts Replacement for HRSG Block 2 at PT PLN Nusantara Power UP Muara Karang

Category

Industrial

Client

PT PLN Nusantara Power

Location

Jakarta, Indonesia

Date

2025 - 2025

Share

Restoring Control Valve Performance and Reliability

INALIX carried out the replacement of Control Valve inner parts in the HRSG system at Block 2 of PT PLN Nusantara Power UP Muara Karang.

The work focused on replacing internal valve components to support proper valve operation, maintain flow regulation performance, and ensure the reliability of the associated process system.

Through this maintenance work, INALIX contributes to maintaining equipment performance, supporting operational stability, and enhancing the reliability of critical systems within the power generation facility.

More Portfolios

OTHER PROJECTS

Essential MOV Replacement for HRSG and Steam Turbine Block 2 at PT PLN Nusantara Power UP Muara Karang

Replacement of the Motor Operated Valves (MOVs) serving the essential systems of the Heat Recovery Steam Generator (HRSG) and Steam Turbine (ST) at Block 2 of PT PLN Nusantara Power UP Muara Karang. This project was carried out to support equipment reliability, maintain operational performance, and ensure the availability of critical valve systems within the power generation facility.