Case Study

Electronics System Design & Build for SUB Terminal 2 Lounge Beautification

Electronics System Design & Build for SUB Terminal 2 Lounge Beautification

Date

2026

Share

Integrated Electronics for Lounge Enhancement

INALIX delivered the design and build of electronic systems as part of the lounge beautification project at SUB Terminal 2.

The project involved the planning, installation, and integration of electronic infrastructure to complement the redesigned lounge environment while ensuring reliable system performance and seamless operation.

Through the integration of technology and functional design, the implementation supports a more modern, comfortable, and enhanced lounge experience for airport passengers.

More Portfolios

OTHER PROJECTS

FIDS Videowall Procurement & Installation at I Gusti Ngurah Rai International Airport

FIDS Videowall Procurement & Installation at I Gusti Ngurah Rai International Airport

Procurement and installation of the Flight Information Display System (FIDS) Videowall at I Gusti Ngurah Rai International Airport to enhance the delivery and visibility of real-time flight information within the terminal. The project provides a large-scale visual information platform designed to deliver clear, accurate, and accessible flight information while supporting an improved passenger experience.