Case Study

FIDS & Master Clock Revitalization and Airport Announcement System (AAS) Upgrade at Adi Soemarmo International Airport

FIDS & Master Clock Revitalization and Airport Announcement System (AAS) Upgrade at Adi Soemarmo International Airport

Client

PT Angkasa Pura II

Date

2025

Share

Airport Information & Communication System Revitalization

INALIX carried out the revitalization of the FIDS and Master Clock, along with an upgrade of the Airport Announcement System (AAS), to improve the performance and reliability of the airport’s information infrastructure.

The FIDS revitalization enhances the delivery of real-time flight information to passengers, while the Master Clock ensures consistent time synchronization across connected systems and devices.

The AAS upgrade further strengthens passenger communication by improving the airport’s capability to deliver clear and effective announcements throughout the terminal.

Together, these improvements provide a more integrated and reliable information ecosystem that supports efficient airport operations and an enhanced passenger experience.

More Portfolios

OTHER PROJECTS

AOCC Videowall Implementation at Yogyakarta International Airport (YIA)

AOCC Videowall Implementation at Yogyakarta International Airport (YIA)

Implementation of an integrated videowall system for the Airport Operations Control Center (AOCC) at Yogyakarta International Airport (YIA) to support centralized monitoring and operational coordination. The solution provides a large-scale visual information platform that enables airport operators to monitor critical operational information and improve situational awareness within the AOCC environment.

CCTV System Procurement & Normalization at PJB-UP Muara Tawar

CCTV System Procurement & Normalization at PJB-UP Muara Tawar

Procurement and normalization of the CCTV system at PJB-UP Muara Tawar to restore and enhance the reliability, availability, and performance of the existing surveillance infrastructure. The project covers the provision of CCTV equipment, system restoration, and optimization to support effective monitoring and security across designated operational areas.

Retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton

The retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton is intended to modernize and improve the reliability of the DC battery charging system. This system plays a critical role in supplying DC power to various control, protection, and auxiliary systems within the power plant. Through this retrofit work, the Battery Charger systems are expected to maintain reliable operation and support the continuity of DC power supply in accordance with the plant's operational requirements.