Header

Industrial Projects

Home Industrial Projects

Essential MOV Replacement for HRSG and Steam Turbine Block 2 at PT PLN Nusantara Power UP Muara Karang

Replacement of the Motor Operated Valves (MOVs) serving the essential systems of the Heat Recovery Steam Generator (HRSG) and Steam Turbine (ST) at Block 2 of PT PLN Nusantara Power UP Muara Karang. This project was carried out to support equipment reliability, maintain operational performance, and ensure the availability of critical valve systems within the power generation facility.

Procurement of Battery Charger and Battery Storage System for EDG Phase 1, Block 1 CCGT Plant at PT PLN Nusantara Power UP Muara Karang

Procurement of a battery charger and battery storage system for the Emergency Diesel Generator (EDG) Phase 1 at Block 1 of the Combined Cycle Gas Turbine (CCGT) Power Plant at PT PLN Nusantara Power UP Muara Karang. The project supports the reliability of the EDG electrical system by ensuring the availability of a dependable DC power supply for emergency generator starting and essential auxiliary functions.