AI Murni Slum Shut Valve Replacement for GTS at Block 2 CCGT Plant, PT PLN Nusantara Power UP Muara Karang

Replacement of the Slum Shut Valve in the Gas Turbine System (GTS) at Block 2 of the Combined Cycle Gas Turbine (CCGT) Power Plant, PT PLN Nusantara Power UP Muara Karang. The project involved the replacement of critical valve equipment to support the reliability of the gas turbine fuel system, maintain operational performance, and ensure the proper functioning of the associated gas supply system.

Retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton

The retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton is intended to modernize and improve the reliability of the DC battery charging system. This system plays a critical role in supplying DC power to various control, protection, and auxiliary systems within the power plant. Through this retrofit work, the Battery Charger systems are expected to maintain reliable operation and support the continuity of DC power supply in accordance with the plant's operational requirements.

Procurement of 300 HP AC Electric Motor for Fire Pump, PT Airindo Teknologi Perkasa

The procurement of a 300 HP Alternating Current (AC) electric motor for a fire pump for PT Airindo Teknologi Perkasa is intended to support the operation of the fire protection system. The motor serves as the primary drive for the fire pump, providing the mechanical power required to deliver water at the pressure and flow rate needed for firefighting applications. This equipment is expected to support reliable fire pump operation and ensure the readiness of the fire protection system when required.

Procurement of Video Wall for the Digital Power Plant (DPP) Room, HSH Unit, PT PLN Nusantara Power Head Office

The procurement of a video wall for the Digital Power Plant (DPP) Room at the HSH Unit of PT PLN Nusantara Power Head Office is intended to support centralized monitoring and visual presentation of operational information. The video wall serves as an integrated display solution for presenting data, system dashboards, and other operational information to facilitate monitoring activities and support decision-making. This installation is expected to improve information visibility, facilitate operational supervision, and support the digitalization of power plant management.

Procurement of Condensate Pump for Unit 1 at Bangka Steam Power Plant

The procurement of a condensate pump for Unit 1 at Bangka Steam Power Plant (PLTU Bangka) is intended to support the condensate system within the plant's steam-water cycle. The condensate pump plays an essential role in transferring condensed steam from the condenser to the subsequent stages of the feedwater system, helping maintain continuous water circulation throughout the power generation process. The equipment is expected to support reliable condensate transfer and maintain the operational performance of the plant's steam cycle system.