New installation of Inalix FIDS at Juanda International Airpot. We also provide system maintenance to make sure that system running well and optimized.

Case Details

  • Client Name: Angkasa Pura I - Dinas Operasi & Elektronika Bandara
  • Airport Location: Juanda International Airport
  • Started: March 2002
  • Completed: April 2022
  • Category: FIDS, New Installation, Maintenance

More Portfolios

OTHER PROJECTS

AI Murni Slum Shut Valve Replacement for GTS at Block 2 CCGT Plant, PT PLN Nusantara Power UP Muara Karang

Replacement of the Slum Shut Valve in the Gas Turbine System (GTS) at Block 2 of the Combined Cycle Gas Turbine (CCGT) Power Plant, PT PLN Nusantara Power UP Muara Karang. The project involved the replacement of critical valve equipment to support the reliability of the gas turbine fuel system, maintain operational performance, and ensure the proper functioning of the associated gas supply system.