Header

Inalix Projects

Home Inalix Projects

Procurement of Battery Charger and Battery Storage System for EDG Phase 1, Block 1 CCGT Plant at PT PLN Nusantara Power UP Muara Karang

Procurement of a battery charger and battery storage system for the Emergency Diesel Generator (EDG) Phase 1 at Block 1 of the Combined Cycle Gas Turbine (CCGT) Power Plant at PT PLN Nusantara Power UP Muara Karang. The project supports the reliability of the EDG electrical system by ensuring the availability of a dependable DC power supply for emergency generator starting and essential auxiliary functions.

FIDS & Master Clock Revitalization and Airport Announcement System (AAS) Upgrade at Adi Soemarmo International Airport

FIDS & Master Clock Revitalization and Airport Announcement System (AAS) Upgrade at Adi Soemarmo International Airport

Revitalization of the Flight Information Display System (FIDS) and Master Clock, along with an upgrade of the Airport Announcement System (AAS), to enhance the reliability and effectiveness of passenger information systems within the airport. The project focuses on modernizing and optimizing existing systems to support more integrated and reliable flight information delivery, time synchronization, and airport announcements.

AI Murni Slum Shut Valve Replacement for GTS at Block 2 CCGT Plant, PT PLN Nusantara Power UP Muara Karang

Replacement of the Slum Shut Valve in the Gas Turbine System (GTS) at Block 2 of the Combined Cycle Gas Turbine (CCGT) Power Plant, PT PLN Nusantara Power UP Muara Karang. The project involved the replacement of critical valve equipment to support the reliability of the gas turbine fuel system, maintain operational performance, and ensure the proper functioning of the associated gas supply system.