Enhancing Electrical Power Supply Reliability
INALIX carried out the procurement of one battery bank and charger system for Unit 2, Phase 2 at PT PLN Nusantara Power UP Kaltim Teluk.
The battery and charger system plays an important role in providing a reliable DC power source for essential electrical and control equipment, particularly when the primary power supply is unavailable.
Through this procurement, INALIX supports the availability of backup power infrastructure, enhances electrical system reliability, and contributes to maintaining operational continuity at the power generation facility.

SIOPSKOM Application - Angkasa Pura I (Phase 2)

Juanda International Airport - FIDS, New Installation & System Maintenance
Procurement of consumable materials to support the 2025 overhaul activities for Units 3 and 4 at PT PLN Nusantara Power UP Cirata. The procurement was intended to ensure the availability of essential materials required for scheduled maintenance, supporting equipment reliability and the readiness of the power generation units.