Supporting Emergency Power System Reliability

INALIX carried out the procurement of a battery charger and battery storage system for EDG Phase 1 at Block 1 of the CCGT Power Plant at PT PLN Nusantara Power UP Muara Karang.

The battery storage and charger system provides the DC power required to support the Emergency Diesel Generator (EDG), particularly during emergency conditions when reliable backup power is essential.

Through this procurement, INALIX contributes to maintaining the readiness of the emergency power system, supporting reliable generator operation, and enhancing the overall reliability of the power generation facility.

More Portfolios

OTHER PROJECTS

FIDS Videowall Procurement & Installation at I Gusti Ngurah Rai International Airport

FIDS Videowall Procurement & Installation at I Gusti Ngurah Rai International Airport

Procurement and installation of the Flight Information Display System (FIDS) Videowall at I Gusti Ngurah Rai International Airport to enhance the delivery and visibility of real-time flight information within the terminal. The project provides a large-scale visual information platform designed to deliver clear, accurate, and accessible flight information while supporting an improved passenger experience.