Procurement of MOV Materials for the ID Fan and Turbine Areas of Unit 20 at PT PLN Nusantara Power UP Rembang

Category

Industrial

Client

PT PLN Nusantara Power

Location

Rembang, Indonesia

Date

2022 - 2022

Share

Supporting Reliable MOV Operations in Power Plant Systems

INALIX supports the procurement of Motor Operated Valve (MOV) materials for the ID Fan and Turbine areas of Unit 20 at PT PLN Nusantara Power UP Rembang.

MOV components play an important role in controlling fluid flow through automated valve operation. Maintaining the condition of these components helps support equipment performance and operational reliability.

Through this project, INALIX contributes to supporting the maintenance requirements and operational continuity of the power plant.

More Portfolios

OTHER PROJECTS

AOCC Videowall Implementation at Yogyakarta International Airport (YIA)

AOCC Videowall Implementation at Yogyakarta International Airport (YIA)

Implementation of an integrated videowall system for the Airport Operations Control Center (AOCC) at Yogyakarta International Airport (YIA) to support centralized monitoring and operational coordination. The solution provides a large-scale visual information platform that enables airport operators to monitor critical operational information and improve situational awareness within the AOCC environment.

Barix & ATV Installation, FIDS Maintenance, and AAS Clustering at Hang Nadim International Airport

Barix & ATV Installation, FIDS Maintenance, and AAS Clustering at Hang Nadim International Airport

Installation of Barix and ATV equipment, maintenance of the Flight Information Display System (FIDS), and Airport Announcement System (AAS) clustering at Hang Nadim International Airport. The project covers multiple airport information and communication systems to enhance system reliability, improve announcement distribution, and support the continuity of passenger information services and day-to-day airport operations.

Retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton

The retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton is intended to modernize and improve the reliability of the DC battery charging system. This system plays a critical role in supplying DC power to various control, protection, and auxiliary systems within the power plant. Through this retrofit work, the Battery Charger systems are expected to maintain reliable operation and support the continuity of DC power supply in accordance with the plant's operational requirements.