Case Study

Procurement of Storage Battery for STG #1.0 and Lobby, Phase 1 at PT PLN Nusantara Power UP Muara Karang

Category

Industrial

Client

PT PLN Nusantara Power

Location

Jakarta, Indonesia

Date

2020 - 2020

Share

Reliable Backup Power for Essential Plant Systems

INALIX supports the procurement of storage batteries for STG #1.0 and the Lobby, Phase 1 at PT PLN Nusantara Power UP Muara Karang.

Storage batteries play an important role in providing backup DC power to support critical electrical equipment and maintain system availability during power interruptions. Their reliability is essential to supporting safe and continuous plant operations.

Through this project, INALIX contributes to strengthening the plant’s electrical infrastructure and supporting operational continuity.

More Portfolios

OTHER PROJECTS