Enhancing the Reliability of the 220 VDC Battery Charger System

INALIX supports the retrofit of 220 VDC Battery Chargers #1 and #2 at PT PLN Nusantara Power UP Paiton as part of ongoing efforts to maintain and improve the reliability of the power plant’s electrical infrastructure.

The Battery Charger is a critical component of the plant’s DC system, ensuring the availability of power for control equipment, protection systems, and other supporting facilities.

Through this project, INALIX contributes to maintaining electrical system reliability and supporting the operational continuity of the power plant.

More Portfolios

OTHER PROJECTS

FIDS & AAS System Implementation at Injourney Airports Semarang

FIDS & AAS System Implementation at Injourney Airports Semarang

Implementation of an integrated Flight Information Display System (FIDS) and Airport Announcement System (AAS) to support efficient passenger information delivery and airport operations at InJourney Airports Semarang. The solution enables real-time flight information distribution across airport display points while providing a centralized announcement system for clear, timely, and consistent passenger communication.

Procurement of Battery Charger and Battery Storage System for EDG Phase 1, Block 1 CCGT Plant at PT PLN Nusantara Power UP Muara Karang

Procurement of a battery charger and battery storage system for the Emergency Diesel Generator (EDG) Phase 1 at Block 1 of the Combined Cycle Gas Turbine (CCGT) Power Plant at PT PLN Nusantara Power UP Muara Karang. The project supports the reliability of the EDG electrical system by ensuring the availability of a dependable DC power supply for emergency generator starting and essential auxiliary functions.